afritec-logo

Rubber factory extension to 10T/h

Ivory Coast
Rubber factory extension to 10T/h

Rubber factory extension to 10T/h

Ivory Coast
Rubber factory extension to 10T/h

About The Project

Realized and operational
The production capacity was increased by installing a fourth rubber drier and a new filling line, while maintaining production throughout the whole construction period.

Current/prev. situation

0  €/liter

Fuel cost

0  liter/year

FUEL CONSUMPTION​

€  0

Total fuel cost

New situation

0  €/liter

Virtual energy cost (all-in)

0  liter/year

Virtual Energy Consumption

€  0

Total energy cost

Benefits

0  liter

Yearly fuel savings

€  0

Yearly savings

0  %

Fuel savings ratio

0  ton/year

CO2 Reduction

Related

Other Projects

Palm oil mill 30 T/h

| Ghana

Rubber factory extension to 10T/h

| Ivory Coast

Palm kernel crushing plant 100 T/day

| Cameroun

Palm oil mill 30 T/h

| Ghana

Rubber factory extension to 10T/h

| Ivory Coast

Palm kernel crushing plant 100 T/day

| Cameroun

Palm oil mill 30 T/h

| Ghana

Rubber factory extension to 10T/h

| Ivory Coast

Palm kernel crushing plant 100 T/day

| Cameroun
Get a Free Quote

Find out how much your business can save.